Container Crane Painting
Port of Everett
EXPIRED

DETAILS

location:  Everett , WA-SNOHOMISH County
bid date & time:  April 16, 2019 4:00 PM (PDT)
summary:  The Port of Everett is seeking contractors to paint two used 100-foot gage Mitsubishi 50 LT container cranes. Work includes surface preparation, paint application and painting crane numbers and Port of Everett lettering on both cranes. The cranes are currently located in the Port of Los Angeles and will be relocated to the Port of Everett’s South Terminal in June 2019. Additional Work includes repainting the machine house roofs of Crane 1 and Crane 2 currently located at the Port of Everett.
consultant:
engineer's estimate:  -

DOCUMENTS

PostedDocumentSize
March 05, 2019 Reference Doc - Stormwater Pollution Prevention Plan - Port of Everett Marine Terminals 4 MB
March 07, 2019 RFP Crane Painting 18 MB
March 19, 2019 Pre-Proposal Mtg Attendees (Everett) 190 KB
March 19, 2019 Container Crane Painting Pre Proposal PowerPoint 3 MB
March 26, 2019 Container Crane Painting Site Visit Attendees (POLA) 449 KB
March 28, 2019 Addendum No. 1 1 MB
April 02, 2019 Addendum No. 2 2 MB
April 08, 2019 Addendum 3 10 MB

ANNOUNCEMENTS

Posted Project Announcements
No announcements have been posted.
March 07, 2019
The site walk at Evergreen Terminals is scheduled for 9:00 a.m. on 3/21.
0
March 12, 2019
The site walk at Evergreen Terminals is scheduled for 9:00 a.m. on 3/21. This information can be found in the Proposal Requirements section, Article 5. Pre-Submittal Meeting, third paragraph.
0
March 19, 2019
Proposer’s staff attending the site visit in Port of Los Angeles(POLA), must forward a copy of the attendee’s government issued identification to Lindsey Hodge (LHodge@portofeverett.com) by close of business today. The POLA site visit is scheduled for March 21, 2019 at 9:00 a.m. Attendees must arrive at Everport Terminal located at 389 Terminal Island Way, Terminal Island, CA no later than 8:45 a.m. Please make sure to bring your personal protective equipment such as, hard hat, high visibility safety vest/coat, and safety shoes. (See Proposal Requirements section, Article 5. Pre-Submittal Meeting, third paragraph.)
0
April 02, 2019
On April 9th, a portion of 13th Street will be closed limiting thru access to the Waterfront Center. To drop off a proposal, please use the 10th street access from West Marine View Drive.
0
April 05, 2019
The Port will be issuing another addendum later today which adds additional drawings and extends the proposal due date. The proposals will be due on April 16, 2019 at 4:00 p.m.
0

RFI BOARD

Posted Posted Question
No RFI responses have been posted.
1.
Q: Have you considered painting the cranes in LA?
March 12, 2019
A: Yes, the Port considered painting the cranes in LA but for a number of reasons we cannot do so.
0

2.
Q: We don't currently hold the required certifications for painting and lead abatement but do hold other certifications similar. What should we do?
March 13, 2019
A: Please provide information on the certifications your firm does have for the evaluation team to consider.
0

3.
Q: Can you post the powerpoint from the pre-proposal meeting?
March 19, 2019
A: The PowerPoint has been posted.
0

4.
Q: Is the Port accepting or equal paint systems or are you firm on the Sherwin Williams materials only?
March 20, 2019
A: The Sherwin Williams paint system and color specified in the RFP documents are to be considered “pre-approved” and are preferred by the PORT. Bidder must demonstrate in its proposal to the satisfaction of the PORT that any substitution is equal to the Sherwin Williams paint system and be in full compliance with all the requirements of the RFP documentation. Any proposed paint system(s) must be compatible with one another and substrates indicated, under conditions of service and application as demonstrated by manufacturer, based on testing and field experience. For other paint manufacturers to be used, paint color samples must be submitted to the PORT for approval. The PORT may select up to three hues of the main crane color for mock-up painting.
0

5.
Q: How much, if any, shore power is/will the Port provide to the contractor performing the work?
March 27, 2019
A: The PORT has a 480v 60 amp 3 phase pin and sleeve outlet available adjacent to the work site for Contractor use.
0

6.
Q: Per addendum 1, is there a map of where the pad eyes are located?
April 01, 2019
A: This will be addressed in Addendum 2.
0

7.
Q: How is/will the Port handle weather days? With $5000/d LD's it is important to know weather days can/will be added to the contract completion date with no penalty to the contractor.
April 01, 2019
A: Please refer to section 00 72 00 General Conditions 2.6 Extension of Time (specifically 2.6.3 c) and 09 90 00 1.06 Project Conditions. Should weather conditions exceed limits set in 09 90 00 1.06, additional days will be granted in accordance with 00 72 00 article 2.6.
0

8.
Q: Is the contact for the optional work basket listed on the drawings provided in addendum 2?
April 02, 2019
A: Please email Willie Watson for the contact information – willie@portofeverett.com.
0

9.
Q: 1. Where can the drawing / detail sheets for the steel portions that are located underneath the main skeleton beams which are identified at B - G (main structure girders) on revised drawing B01101 - Main Skeleton Diagram? There seems to be a substantial amount of steel under here that is not indicated on any drawing sheets. Drawing sheet B01110-1 - main structure girder View A, Section D, appears to only show the section of the stiffener plates inside the girder beams. This steel could be viewed during the site visitation, but there do not seem to be any documents showing sizes / shapes. 2. Where can the details for the sizes of platforms, walkways and railings be located? Please advise.
April 05, 2019
A: Answer to Q1: On drawing B01101 the designations “B1 through B7” and “G1 through G9” are section cuts through the boom and main girder. These section are found along the bottom portion of the drawing. The external dimensions of the main girder shown on drawing B01110-1 can be found on drawing B01101 Answer to Q2: Addendum 3 will be issued later today or Monday a.m. to provide additional drawings
0

10.
Q: Will the elevator be available for use?
April 09, 2019
A: No
0

11.
Q: Will the crane trolley be available for use for access during painting?
April 09, 2019
A: No
0

(Name of user and company posting question is not visible to other bidders)

SELF-REGISTERED PLAN HOLDERS

GENERAL CONTRACTORS

Brand Safway Solutions
Brand Safway Solutions
Nik Carlstrom
ncarlstrom@brandsafway.com
O: 206-331-0509
F:

Contact: Nik Carlstrom
Email: ncarlstrom@brandsafway.com
12293 Bartholomew Road, Anacortes, WA 98221
O (206) 331-0509
SUBCONTRACTORS
SUPPLIERS
PLAN CENTERS

PRINT & COPY SERVICES

Please register as a plan holder to display any available print centers in your area.