172nd Street NE & 40th Avenue NE Signal and Median Improvements
City of Arlington
EXPIRED

DETAILS

location:  Arlington, WA-SNOHOMISH County
bid date & time:  August 31, 2021 2:00 PM (PDT)
summary:  Work for constructing the signal and median improvements on 172nd Street NE between Smokey Point Blvd and 43rd Ave NE, shall include furnishing all labor, materials, and equipment to install erosion and water pollution control; removal of existing sidewalk, pavement, and subgrade; clear and grub existing landscaping; base course placement and grading; asphalt paving; construction of storm water conveyance and drainage structures; constructing curb and gutter, sidewalk, ADA curb ramps; landscaping; installing irrigation; installing illumination; installing traffic signals; installing bus shelter pads; installing pavement markings and signing; performing traffic control; and miscellaneous items necessary to complete the project.
consultant:
engineer's estimate:  $1,846,000.00

DOCUMENTS

PostedDocumentSize
August 11, 2021 40thSignal_SubmittalPlanSet_2021-08-10 - Signed 15 MB
August 11, 2021 Final Project Manual_2021-08-10 - Signed 33 MB
August 23, 2021 Zoom Meeting Invite Letter 08-23-2021 63 KB
August 31, 2021 Preliminary Bid Tab 08-31-2021 62 KB

ANNOUNCEMENTS

Posted Project Announcements
No announcements have been posted.

RFI BOARD

Posted Posted Question
No RFI responses have been posted.
1.
Q: Is there any underground utilities or horizontal boring needed on this project?
August 20, 2021
A: Yes there underground utilities on this project. They are shown on several pages, but easiest to read on SG1. The project does not prohibit boring.
0

2.
Q: 1) When the contractor sets up TC7 as shown on sheet 45, will this plan be bound to the time restraints listed on spec page IV-40 for lane closures of 9AM – 3PM? Or, will the contractor be able to leave this plan/configuration in place to complete the work?
August 20, 2021
A: The contractor is not allowed have in place the plan/configuration shown on TC7 beyond the hours listed in the contract. All lanes in both directions will need to be open from 5:00am-9:00am, 3:00pm-8:00pm to relieve peak hour congestion.
0

3.
Q: Construction Note 3 in the irrigation drawing (IR1 – IR4), state to install a service connection and double check with contractor permitting. Is the contractor responsible to procure the connection permits for these locations? What are the connection fees in relation to these connections?
August 20, 2021
A: The city will take care of any permits of connection fee associated with this activity.
0

4.
Q: What are the night lane closure limitations in regard to the signal and intersection work? Can these closure times be used for other portions of the project at night?
August 20, 2021
A: Yes, closure times may be used for various night time work. Specific SR 531 traffic control plans will have to be developed by the contractor and submitted to WSDOT for approval. The approval could state limitations.
0

5.
Q: Bid Item 26: Erosion/Water Pollution Control has a unit measure of FA(Force Account), however, there is no unit price provided. What is the unit price to be used?
August 27, 2021
A: thank you for bringing this to my attention. Please us the sum of $31,000.00
0

(Name of user and company posting question is not visible to other bidders)

SELF-REGISTERED PLAN HOLDERS

GENERAL CONTRACTORS

Granite Construction Company
Granite Construction Company
Amy Sorensen
bid.everett@gcinc.com
O: 425-551-3100
F: 425-551-3118

Contact: Amy Sorensen
Email: bid.everett@gcinc.com
7823 Rush Creek Dr, Pasco, WA 99301
O (425) 551-3100 F (425) 551-3118

Taylor's Excavators Inc.
Taylor's Excavators Inc.
Justin Taylor
bids@tayexinc.com
O: 360-629-3078
F: 360-629-7368

Contact: Justin Taylor
Email: bids@tayexinc.com
3134 268th St NW, Stanwood, WA 98292
O (360) 629-3078 F (360) 629-7368

Stetner Electric
Stetner Electric
Brian Flagg
b.flagg@stetner.com
O: 253-279-6234
F:

Contact: Brian Flagg
Email: b.flagg@stetner.com
840 F St. SW, Quincy, WA 98848
O (253) 279-6234

Road Construction Northwest, Inc.
Road Construction Northwest, Inc.
Matt Wagester
bids@rcnw.com
O: 425-254-9999
F: 425-254-1334

Contact: Matt Wagester
Email: bids@rcnw.com
P.o. 188, C-3, Renton, WA 98057
O (425) 254-9999 F (425) 254-1334

Oceanside Construction
Oceanside Construction
Michel Angelicchio
Bids@Oceanside-Inc.com
O: 360-933-1728
F:

Contact: Michel Angelicchio
Email: Bids@Oceanside-Inc.com
1511 Mt Baker Hwy, Bellingham, WA 98226-8722
O (360) 933-1728
SUBCONTRACTORS
PROFESSIONAL SERVICES
PLAN CENTERS

Abadan Plan Center
Abadan Plan Center
Plan Room Administrator
planroom@abadanplancenter.com
O: 509-747-2964
F: 509-744-3832

Contact: Plan Room Administrator
Email: planroom@abadanplancenter.com
603 E Second Ave, Spokane, WA 99202
O (509) 747-2964 F (509) 744-3832

WCR Plan Center
WCR Plan Center
Dawn Harju
info@wcrinc.com
O: 360-738-0370
F: 360-738-0371
http://www.wcrinc.com

Contact: Dawn Harju
Email: info@wcrinc.com
2215 Midway Ln #208, Bellingham, WA 98226
O (360) 738-0370 F (360) 738-0371
http://www.wcrinc.com

Seattle Daily Journal of Commerce
Seattle Daily Journal of Commerce
Ken Elliott
plans@djc.com
O: 206-622-8272
F: 206-622-8416

Contact: Ken Elliott
Email: plans@djc.com
83 Columbia St., Seattle, WA 98104
O (206) 622-8272 F (206) 622-8416

PRINT & COPY SERVICES

Please register as a plan holder to display any available print centers in your area.